PORTFOLIO

LANGLEY FEDERAL CREDIT UNION
Hampton, VA

Demolition of the 8 story Langley Federal Credit Union, in Hampton, VA.  This project consisted of a total gross area of approx. 70,000 sf building demo.  All materials were segregated, hauled off site, and recycled to reduce the waste stream.  We completed the project in 29 working days, completing the project 60 days ahead of schedule for the client; with no change orders or down time.  With an active lane off the back of the structure, use of our high reach machine brought down the building in a controlled manner.

36 MILITARY HOUSING UNITS
Fort Lee, VA

Demolition and full abatement of 36 military housing units.  All houses were completely abated of pipe insualtion and floortile. Demolition consisted of 36 structures including all driveways, sidewalks, curbing, and site items.

Work was completed over a 2 month time frame.  East Coast utilized its company owned fleet of dump trailers and dump trucks to haul all debris and concrete off site.  All concrete was recycled at a local facility. 

Work was coordinated while working adjacent to occupied housing and active streets, as well as keeping all base safety regulations in mind.

NORFOLK STATE UNIVERSITY - BROWN HALL
Norfolk, VA

East Coast teamed up with S.B. Ballard Construction Company on this two phase project.  With a major building separation completed in Phase 1 to keep Phase 2 operational while the new building would be built.

This portion of the Brown Hall demolition was Phase 2 of the building demolition.  East Coast completed Phase 1, 2 years prior, which included 75,000 sf of structural demo.  Phase 2 included 50,000 sf of structure demolition.  All foundations, multiple parking lots, and site items were removed.

Abatement of both phases were completed prior to demolition.  including removal and legal disposal of all hazardous items including mercury containing bulbs, thermostats, freon, etc.  Both phases were completed on schedule and without and change orders.

OCEANVIEW ELEMENTARY, Norfolk, VA

Demolition and full abatement of the historical Oceanview Elementary School.  This reinforced concrete school consisted of 80,000+ sf and site demo for SB Ballard Construction Company.  Site demo included parking, courts, driveways, and clearing/grubbing. Building demo was completed with hydraulic processors to handle the 3' thick walls and footers.  With an active neighborhood and new elementary school adjacent to the demolition site, safety and organization were of the highest importance.

ANHEUSER BUSCH EVAP TANK
Williamsburg, VA

Controlled demolition and removal of an Evap Tank located in the Anheuser Busch Facility.  With the complexity of its location, the grade of stainless steel, and the presence of an adjacent highly flammable area, we presented the option of our High Reach excavator and hydraulic shear to cut the tank down.  It was also required the footer and tank pad was left for future a build.  The tank was removed in 2 days with no down time to the plant and zero incidents.  All equipment had to be matted to ensure no damage to the impervious surfaces.  Safety was kept at the highest standard while working in the facility.

  • Sheds                     

  • Homes

  • Garages

  • Pools

  • Clearing

OCEAN SIDE INN HOTEL
Virginia Beach, VA

Demolition of the 6 story Ocean Side Inn Hotel located in the Rudee Inlet Loop at the Virginia Beach Oceanfront.  This project consists of a total gross area of approximately 31,000 sf, 6 story building demo.  There was also a pool on site that was hammered and filled, and surrounding parking was infilled and rolled with asphalt millings.  The available space to work was less than an acre.  All materials were segregated, hauled off site, and recycled to reduce the waste stream.  The project was for the City of Virginia Beach.  Work was completed in less than 30 days before the report season started.

SOUTHWESTERN ELEMENTARY SCHOOL
Suffolk, VA

Demolition of the old Southwestern Elementary School located in Suffolk, VA.  Work was complete for the City of Suffolk.  This project consists of a total gross area of approx. 66,000 sf building demo.  Abatement of friable and non-friable materials was completed before demolition.  Gymnasium floors were recycled and repurposed in a future build in Hampton, VA.  The site was backfilled to surrounding grade, topsoiled, and left a green space.  All materials were segregated, hauled off site, and recycled to reduce the waste stream.  

RETREAT AT KEMPSVILLE
Chesapeake, VA

Demolition and clearing of 9+ structures, 5+ acres, and rough grading of the entire site.  This project was located in Chesapeake, VA.  We utilized our fleet of Komatsu's to handle the job.  Project was completed ahead of schedule.  This project showcases the ability for East Coast Demolition to handle large clearing jobs as well as our typical structural demolition.  East Coast offered a complete turn key site scrape.  Limits were cleared for E&S controls to be installed before activities took place.  Safe ingress and egress onto the highway was managed to eliminate accidents and traffic interruptions.

VIMS WATER TOWER DEMO
Gloucester, VA

Controlled demolition and removal of an existing water tower located at the Virginia Institue of Marine Science.

East Coast was contracted to remove the tower in a controlled manner.  With the use of our Volvo High Reach excavator, we were able to complete this task with the least amount of risk to the surrounding structures.  The tower was dropped, processed, and hauled in a day.

The close proximity to other structures only left one way the tower could be laid down, with the structural integrity of the legs in questions, the high reach was chosen as the safest method of dismantling.

FUTURE LIDL: HOTEL DEMOLITION
Hampton, VA

Demolition of an older hotel and restaurant in Hampton, VA, for the major grocery chain LIDL.  This project consisted of a total gross area over 95,000 sf of building demo and over 2 acres of impervious pavement removal.

 

The hotel was reinforced concrete and block.  East Coast had to utilize multiple hammers and processors to process the material.  All materials were hauled off site and concrete and asphalt was crushed at an offsite location. The job was completed in 2 months.  Rough grading was done to leave a positively drained site for the site contractor.

NASA 7x10 WINDTUNNEL
NASA Langley, Hampton, VA

Demolition and complete disposal of the NASA 7x10 Wind Tunnel located in Langley, VA.  Demolition consisted of the entire wind tunnel, towers, testing facility, and restroation of the site.  The project was in close proximity to an existing structure.  East Coast was reconized for the demolition process and extensive safety controls throughout the project. This project was completed in 2010.  This project was completed with our first high reach machine East Coast ever owned, and has set the pace for what East Coast is today.

SOUTHGATE MALL REHAB
Elizabeth City, NC

East Coast was contracted to handle all the demolition for the rehabilitation of the Southgate Mall located in Elizabeth City, NC.

Multiple storefronts, interior walls, facades, and other selective demo items were completed.  The major portion of demolition included 200' of structure separation and containement with the mall still occupied.  Demolition was completed of the old JC Penny's, including all slabs, footers, and pile caps. 

Slabs were cut and shoring was installed for new walls, facades, and columns.  Work was completed over 6 months for the client.  Putting them ahead of schedule and no loss time incidents.